Customization: | Available |
---|---|
After-sales Service: | 5 Years |
Warranty: | 5 Years |
Still deciding? Get samples of US$ 2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Metal Processing Machinery Parts CNC Service |
Product Dimension | Various shapes are available |
Product Shape | Various shapes are available |
Processing Type | Stamping |
Tolerance | ±0.02mm or as per customers' requirement. |
Material Standard: | ISO, DIN, ASTM, UNS, AISI, JIS, BS, NF |
Materials available | Stainless Steel, Carbon Steel, Steel, Copper, Brass, Aluminum, Silver, Gold, Chrome, Tin, Nickel, Zinc, Alloy etc. are available. |
Material Thickness | As per customers' requirement. |
Surface Treatment/Finish | Anodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc., |
Heat treatment capability | Annealing, Normalizing , Nitriding, Tempering ,Carbonitriding, Carburizing and induction hardening etc., |
Industry Of Use | Electrical |
Quality Assurance | GB/T19001-2016 ISO 9001:2015, GB/T240001-2016 ISO 14001:2015, RoHS |
Sample Lead-time | Within 1day for samples available from our stock About 1-2weeks for custom samples |
Mass Production Lead-time | 3-7 weeks after receiving deposit. |
Price Terms: | EXW/FOB/CFR/CIF SHENZHAN or any other airport or seaport, China |
Payment Terms | 30% deposit, balance against B/L copy |
Modification | Mould modification until the customers satisfy it. |
Inspection | In-house or third party, all the products are strictly inspected by skilled QC |
Design: | We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
Country of Origin | China (mainland) |
Main Export Markets | Europe, America, Mid East, Asia, Africa etc., |
Service Type: | OEM & ODM |
Business Type: | Manufacturer, Exportor |
Advantages | Expert in producing OEM parts: metal stamped, machined, deep drawn and sheet metal formed parts with various finishing Our factory is located in Dongguan, nearby Guangzhou and Shenzhen ports, which can save transportation time and cost Employing reliable rockers and utilizing advanced machines: we have a full range of machinery and equipment for punching, welding, CNC, milling and grinding. We also have experienced technicist who are engaged in technical development. Our skilled workers, professional engineers, R and D center and excellent foreign trade team always keep the passion to support our customers |
At Dongguan Sun Hua Plastic Metal Ltd, we shine brightly with unparalleled expertise in the intricate design and masterful fabrication of plastic injection molds, die-casting molds, and rubber molds. Our meticulous precision guarantees exquisite craftsmanship in every project, ensuring the highest standards of quality and excellence. We offer a robust array of comprehensive mass production services tailored precisely to accommodate your specific production volume requirements. Our flexible pricing options are designed to fit your needs perfectly. Kindly reach out with your request, and let us demonstrate our commitment to meeting your manufacturing demands with unmatched efficiency and excellence.
1. Automotive SectorTool Life Cycles | Extremely High Volume | High Volume | Low Volume |
2D Design Drawings | |||
3D Design Drawings | |||
Component ID | |||
Tool Steel ID | |||
Cycle Counter | |||
Spare Ware Parts | |||
Spare Parts List | |||
Fully Automatic Operation | |||
DFM Report | Shall be completed and approved before mold build. All part model changes shall be approved. Report include: KO locations, gate locations, parting line, split lines, mold flow analysis (when required), cosmetic issues, dimensional issues. |
||
Cpk Requirement | Required Cpk requirement for critical dimensions. | ||
Cycle Time Target | Mold cycle time shall meet or exceed targets while producing parts within the Cpk requirements. | ||
Critical Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. | ||
Minor Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. | ||
Self Lubricating Hardware | Hardware that sees movement should be self lubricating per hardware requirements. | ||
Certified Tool Steel | Tool steel shall be certified from steel provider. | ||
Mold Flow Analysis | (when required) | ||
Mold Dimensional Study | |||
Part Dimensional Study |